Live in DFW · More Texas metros nextInsured and bonded$1/sq ft flat fee
Texas roofing company

Save 40–50% on your roof.

Traditional roofing quotes are built around markup. Ours are built around costs. You pay the actual supplier and crew invoice amounts plus one flat fee. That's it.

  • 100% of invoices shown to you
  • Vetted independent crews, At-Cost as contractor of record
  • 10-year workmanship warranty included
MARKUP ON MATERIALS & LABOR
0%
FLAT FACILITATION FEE
$1/sq ft
OF INVOICES SHOWN TO YOU
100%

Get a quote

Request a transparent quote.

Get an instant estimate in 30 seconds. We’ll provide a detailed, human-reviewed quote within an hour.

Free. Takes 30 seconds. No credit card.

Review itemized quote linesNo obligation to proceed
12 people checking prices now
4.8from 8,900+ verified homeowners

Homeowners

What homeowners say.

  • Entered my address, saw the price, scheduled the crew same day.

    Marcus T.Fort Worth, TX
  • Two roofers ghosted me. At-Cost quoted me in 30 seconds.

    Priya L.Arlington, TX
  • Price I saw online was the price I paid. No surprises.

    Derek W.Houston, TX
  • Satellite measurement was spot-on. Exactly what was quoted.

    Alicia M.Plano, TX
  • 25-year warranty and I didn’t take a day off work.

    Tom R.Frisco, TX
  • Neighbor told me to skip the estimator circus. She was right.

    Sandra K.Denton, TX
  • I was quoted $18K locally. At-Cost came in at $11,200.

    Jennifer K.Dallas, TX
  • No salesman in my kitchen for two hours. Just an honest price on my phone.

    Robert M.McKinney, TX
  • After the tornado, everyone was price gouging. At-Cost was fair.

    Angela P.Wylie, TX
  • New roof in under 3 weeks. Calling around would’ve taken 8.

    Rachel B.Dallas, TX
  • Neighbors keep asking who did my roof. Curb appeal is real.

    Chris V.McKinney, TX
  • Crew was professional, cleaned up everything. 12 days start to finish.

    Mike T.Fort Worth, TX
  • The price did not change after they got up there. Never happens with contractors.

    Chris W.Arlington, TX
  • Hail damage, needed a roof fast. Crew out in 2 weeks.

    James O.Grapevine, TX
  • Live in DFW · More Texas metros next
  • Insured and bonded
  • Manufacturer-certified crews
  • Family-owned
How it works

A clear process from quote through closeout.

Get a transparent quote
  1. Aerial illustration of a home with a roof quote document.
    01

    Request a quote

    Get an instant estimate within 30 seconds. We’ll review it and send you a finalized quote within an hour.

  2. Itemized roof estimate connected to a measured roof plan.
    02

    Review every line

    You see every supplier and crew invoice, line by line. Full transparency.

  3. Roofing project cards for crew scheduling and material delivery.
    03

    Fund and schedule

    Fund your project account for easy, milestone-based payments to suppliers and crews that you control.

  4. Itemized project receipt and completed roofing checklist.
    04

    See every receipt

    Full financial ledger for your project. Photo documentation of every stage. All stored in your portal.

The old way vs the new way

Where does the money go?

On a typical 25-square reroof, here's an example of how a traditional roofing company's quote compares to At-Cost Roofing's quote.

Same scope, same materials
$6,250saved · 41% lower
Typical contract view

Traditional roofer

  • Remove and replace shingles - 25 sq
  • Replace underlayment
  • Replace all ventilation
Total to homeowner
$15,320

No transparency.

One number. No supplier or crew invoices behind it.

Quit paying for overhead

At-Cost Roofing

At-Cost
  • Materials, supplier invoice$3,835
  • Labor, crew invoice$2,000
  • Dump fees$385
  • Permit$100
  • Pre-build inspection$250
  • Facilitation fee$2,500
  • 10-year workmanship warrantyIncluded
Full transparency
Total to homeowner
$9,070

Numbers are illustrative and based on a 25-square asphalt reroof in North Texas. Your project will be quoted to your actual roof, materials, and crew rates, line by line, for your region.

Pricing

Transparent pricing.

Every project includes the amounts invoiced to us by suppliers and crews, plus a flat facilitation fee for the work we do behind the scenes, including permits, project-account coordination, documentation, and a 10-year workmanship warranty.

Facilitation fee

Flat rate
$1/ square foot of measured roof area
$1,500 minimumMeasured by satellite report, not living area
What this covers
  • Material ordering and supplier management
  • Crew vetting, hiring, and scheduling
  • Jobsite delivery coordination
  • Owner-controlled project account
  • Permit pulling (permit fees passed through at actual cost)
  • Owner-approved milestone payments
  • Milestone photo documentation (tear-off, dry-in, final - yours to keep)
  • 10-year workmanship warranty
  • Manufacturer warranty registration
  • Customer portal for updates, photos, and invoices

Change order reserve

Refundable hold

Every project carries a minimum $1,000 refundable reserve in the dedicated project account you control. Larger or more complex scopes may require more. Your amount is confirmed before you sign.

  • All change orders require your written approval
  • Automated supplier and crew milestone payments require your approval
  • Unused reserve and refunds for returned leftover materials go back to you at closeout
Documentation

Every job, fully documented.

Every milestone is photographed by the crew and saved to your project record: tear-off, dry-in, and final. You can see your roof being replaced even when you’re not home. The full photo package is yours to keep.

  • Stored to your project portal at every milestone.
  • Yours to download. Useful for warranty, resale, or the next claim.
Project 2841 · Fort Worth, TX
42 photos
  1. Exposed roof decking and flashing during tear-off inspection.
    01Tear-off
    Decking exposed and inspected
  2. Roofing crew installing synthetic underlayment over new decking.
    02Dry-in
    Underlayment and ice & water set
  3. Roofing crew completing a charcoal shingle roof at dusk.
    03Final
    Finished roof, ridge, and flashing
Trust and quality

Lower overhead. No lower standard.

Our lower cost comes from technology and a lean operating model, not traditional 50% sales commissions, a huge office staff, fleets of wrapped trucks, or layers of unnecessary expense. We make the project more transparent, efficient, and easier to manage without lowering installation standards.

Transparent by default

Supplier, crew, permit, inspection, and At-Cost fee lines stay separate so you can see what you pay for.

Efficient by design

Technology keeps quoting, coordination, photos, and project records moving without layers of office overhead.

One easy experience

As contractor of record, At-Cost coordinates crew, materials, permits, schedule, and closeout in one clear process.

FAQ

Questions, answered plainly.

A clear process from quote through closeout

Ready to see the receipts?

Enter your address and get an instant estimate in 30 seconds. We review it and send a finalized quote within an hour, with supplier, crew, and permit costs separated from the facilitation fee.

Get a transparent quote
Review itemized quote lines · No obligation to proceed